Tenriajeng, Andi Tenrisukki, Indonesia
-
Vol 9, No 1 (2010) - Articles
ANALISA SIMPANG TERINTEGRASI PADA JAM SIBUK PAGI (STUDI KASUS PADA SIMPANG CILIBENDE DENGAN SIMPANG LODAYA KOTA BOGOR)
Abstract ABSTRACT -
Vol 9, No 2 (2010) - Articles
STUDI PERHITUNGAN BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN SISTEM MANAJEMEN KONVENSIONAL DAN SISTEM MANAJEMEN ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)
Abstract ABSTRACT