Tenriajeng, Andi Tenrisukki, Indonesia

  • Vol 9, No 1 (2010) - Articles
    ANALISA SIMPANG TERINTEGRASI PADA JAM SIBUK PAGI (STUDI KASUS PADA SIMPANG CILIBENDE DENGAN SIMPANG LODAYA KOTA BOGOR)
    Abstract  ABSTRACT
  • Vol 9, No 2 (2010) - Articles
    STUDI PERHITUNGAN BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN SISTEM MANAJEMEN KONVENSIONAL DAN SISTEM MANAJEMEN ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)
    Abstract  ABSTRACT